Potential Effects on Large Mara Construction Projects Due To Construction Delay
Keywords:
construction delay, MARA construction projects, Malaysia,Abstract
The construction industry continues to be the driving force in the growth of the nation’s socio economic development. One of the major issues in large construction industry is its frequent delay where this delay decelerates the multiplier effects to the economy. This paper presents the study of a survey on significant cause of delay and its effects in large MARA (Majlis Amanah Rakyat) construction project in the views of project management consultants (PMC). Respondents of this survey were personnel that work as PMC ranging from the executives, managerial and supporting groups. The result revealed that the five most significant delay causes as seen by PMC were cash flow and financial difficulties faced by contractors, contractor’s poor site management, inadequate contractor experience, shortage of site workers and ineffective planning and scheduling by contractors and its three most significant effects were time overrun, cost overrun and arbitration. Hopefully, the findings of this study will at least shade some lights to the problems faced by Malaysia construction industry particularly MARA large construction project and effort can be taken to improve it.
Downloads
Downloads
How to Cite
Issue
Section
License
Open access licenses
Open Access is by licensing the content with a Creative Commons (CC) license.
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.