Memon, A.H. and Mohammad Zin, R. (2011) “Resource-Driven Scheduling Implementation in Malaysian Construction Industry”, International Journal of Sustainable Construction Engineering and Technology, 1(2), pp. 77–90. Available at: https://penerbit.uthm.edu.my/ojs/index.php/IJSCET/article/view/65 (Accessed: 4 July 2024).