Kusumadarma, I.A. (2020) “Developing Project Schedule in Telecommunication Projects Using Critical Path Method (CPM)”, International Journal of Integrated Engineering, 12(3), pp. 60–67. Available at: https://penerbit.uthm.edu.my/ojs/index.php/ijie/article/view/4203 (Accessed: 15 September 2024).