1.
Kassim A, Sarman A. Optimising The Implementation of Building Information Modelling in 4D (Scheduling) and 5D (Cost) for Highway and Bridge Construction. IJIE [Internet]. 2025 Sep. 19 [cited 2026 Jul. 23];17(3):172-83. Available from: https://penerbit.uthm.edu.my/ojs/index.php/ijie/article/view/17887