[1]
Apriliani, R.A. et al. 2024. Design Alternatives Selection for Cost and Time Efficiency Using Value Engineering Method: Case Study of Ramp 5 Wringinanom Junction Krian – Gresik Toll Road. Journal of Advanced Industrial Technology and Application. 5, 2 (Dec. 2024), 56–69.