Apriliani, R.A. (2024) “Design Alternatives Selection for Cost and Time Efficiency Using Value Engineering Method: Case Study of Ramp 5 Wringinanom Junction Krian – Gresik Toll Road”, Journal of Advanced Industrial Technology and Application, 5(2), pp. 56–69. Available at: https://penerbit.uthm.edu.my/ojs/index.php/jaita/article/view/18708 (Accessed: 12 March 2026).