[1]
R. A. Apriliani, M. M. . Syakurohin, R. Santosa, K. B. Hastono, and D. I. Yuliastuti, “Design Alternatives Selection for Cost and Time Efficiency Using Value Engineering Method: Case Study of Ramp 5 Wringinanom Junction Krian – Gresik Toll Road”, jaita, vol. 5, no. 2, pp. 56–69, Dec. 2024, Accessed: Mar. 12, 2026. [Online]. Available: https://penerbit.uthm.edu.my/ojs/index.php/jaita/article/view/18708