Apriliani, Rizki Astri, et al. “Design Alternatives Selection for Cost and Time Efficiency Using Value Engineering Method: Case Study of Ramp 5 Wringinanom Junction Krian – Gresik Toll Road”. Journal of Advanced Industrial Technology and Application, vol. 5, no. 2, Dec. 2024, pp. 56-69, https://penerbit.uthm.edu.my/ojs/index.php/jaita/article/view/18708.