Constructing a Railway Viaduct Crossing KL - Kuala Selangor Expressway (LATAR) for ECRL Project: Technical Feasibility and Challenges

Authors

  • Daniel Saputra Universiti Tun Hussein Onn Malaysia Author

Keywords:

Railway Viaduct Construction, ECRL, Railway Viaduct, Segmental Box Girder (SBG), LATAR Expressway

Abstract

This study investigates the technical feasibility and engineering challenges in constructing a railway viaduct crossing the KL-Kuala Selangor Expressway (LATAR) at Bridge 18, as part of the East Coast Rail Link (ECRL) alignment. A mixed-methods approach was applied, combining qualitative interviews and focus group discussions with field measurements and technical data analysis. Key challenges include limited construction space, soil instability, and minimum clearance requirements above the expressway. Findings indicate that a special span using a Segmental Box Girder (SBG) with full-span launching and bored pile foundations is the most viable solution. The study offers practical references for future viaduct construction projects in similarly constrained locations in Malaysia.

Downloads

Published

16-10-2025

Issue

Section

Transportation

How to Cite

Bin Asmadi, D. S. (2025). Constructing a Railway Viaduct Crossing KL - Kuala Selangor Expressway (LATAR) for ECRL Project: Technical Feasibility and Challenges. Progress in Engineering Application and Technology, 6(2), 351-359. https://penerbit.uthm.edu.my/periodicals/index.php/peat/article/view/21012